The loop construction and installation is carried out by qualified welders following BRAM-COR sanitary piping procedures, according to ASME BPE standards. All pipelines are passivated and inspected, according to ASME acceptance criteria,to check A thoroughly loop documentation, including isometric drawings, welding reports, boroscopy records, passivation certificate and test reports is provided to complete the supply